Who pours concrete footings in Juneau?

Juneau Concrete digs, forms and pours concrete footings in Juneau, the buried concrete that carries a deck, porch, addition or shed. I come out to look at the job and write the estimate myself, our own crew does the work, and I'm there for the pour.

Most calls start with a plan for a deck, a porch or an addition, or with posts that have started to lean. Footings carry that weight down to solid ground. Here the trouble is frost, because wet ground swells when it freezes and lifts anything sitting too shallow, then lets it down in the thaw. If your house has already settled, foundation raising may come first.

We lay out each footing, dig, build the forms and set the rebar, the steel bars that hold the concrete together when the ground pushes on it. Then we pour and keep it warm while it cures and gains strength. I write the reinforcement out on the estimate so you can compare it line by line. If an old slab is in the way, we handle the concrete cutting too.

None of this shows once the deck is built, which is why it's the first place a tight budget gets trimmed. I'd rather you trim the decking. A nice deck on a shallow footing is just a crooked deck that hasn't happened yet.

What goes into it

  • Depth confirmed with the city first
  • Layout for each pier or run
  • Digging below the frost's reach
  • Forms for piers or strip footings
  • Rebar set before the pour
  • Cold-weather protection while it cures

What to weigh before booking concrete footings

  • What moves the price

    The number of piers or feet of footing, how deep we dig, how much steel goes in, and whether cold nights mean blankets or heat. Tight access adds work too.

  • What the timing turns on

    Weather mostly, since we pour when the ground and the forecast allow. A permit, if your project needs one, comes first, and cold weather slows the cure.

  • Piers or a strip footing

    Piers suit decks and porches that sit on posts, while a strip footing, one continuous trench of concrete, carries a wall like an addition's. The structure usually decides it for you.

Concrete footing questions from Juneau

  • How much do concrete footings cost in Juneau?

    Across the US, an installed residential strip footing usually costs about $5 to $19 per linear foot, counting concrete, labor, digging and forms. That's a national figure, not our price. Depth, steel, access and cold-weather protection move it here, so I look the job over in person and give you a written estimate.

  • Do I need a permit for deck footings in Juneau?

    If the deck is attached to the house, yes, because the city requires a building permit for attached decks, porches, terraces and patios, filed online with the Permit Center. The city lets a small freestanding deck go without one when it's under 200 square feet, less than 30 inches off the ground, and has no roof or railing. The application includes a foundation plan, and the city offers a standard one. We're fully licensed and insured, and when a permit's needed we file it and book the inspections through our Civic Access account, while for footings under anything else we ask the Permit Center before we start. On a downtown lot, check the city's avalanche maps too, since building there falls under its avalanche-area rules.

  • How deep should concrete footings be in Juneau?

    Deep enough that frost can't get under them, and the exact depth for your spot comes from the city's building staff. One footing maker gives the same instruction and points installers to local officials for the number. I confirm the depth with the city before we dig a single hole, because a footing that frost can reach gets lifted in winter and dropped in spring.

  • Can concrete footings be poured in cold weather in Juneau?

    Yes, with planning, and cold here doesn't only mean winter. A Michigan concrete guide treats air at or expected to drop below 40°F as cold weather, because fresh concrete can freeze before it gains strength, and early-fall and late-spring nights get there. That guide says to pour only on thawed ground and keep new concrete at 50°F or above for at least 3 days under insulated blankets, straw or a heated enclosure. Ask any crew which of those they plan to use, and I'll tell you ours at the estimate.

  • What causes footings to heave or crack in winter?

    Frozen ground, mostly, swelling under a footing that sits too shallow and dropping it again in the thaw. Alaska extension guidance says concrete foundations should be properly reinforced to limit that cracking and to keep radon out, and reinforced against earthquakes in line with local or state codes. It also says to close the building in and heat it through winter so the heaving and settling don't get excessive. That's why the steel gets its own lines on our estimate.

  • How do I choose between a straight pier and a bell-bottom footing?

    A straight tube suits a standard pier, while a bell-bottom form spreads the load over a wider base. One supplier says that wider base reduces settling in softer soil and can cut the number of piers a job needs. I'll tell you which one fits once I've seen your ground and what it has to hold.

Concrete footings near you

We're based in Juneau and pour footings across the City and Borough. Pick your area below, or call (907) 560-0628 if yours isn't listed.

Get a free estimate on your footings

Tell us what you're building, how big, whether it's attached and the address. We reply within one business day and I'll come out for a free, no-obligation estimate.

(907) 560-0628